• FrançaisFrançais
Biomass Technology Laboratory Biomass Technology Laboratory
  • Home
    • Government
    • Student
    • Industrial
  • Who We Are
    • Our team
    • Our expertise
    • Laboratory
      • Analysis
      • Our equipment
    • Organizational chart
    • BTL International
  • Publications
  • News
  • Video
  • Contact us
  • FrançaisFrançais
Biomass Technology Laboratory
Home / Blog / News / BTL United

BTL United

From August to September 2020, the BTL team will be finally united at the Scale Up Center (our own building) at the Université de Sherbrooke. After 4 years apart, the fundamental portion of the lab will be united again with the scale-up and engineering part. Even part of our biological team will be joining the party. Of course, our beloved L.A.B will also be moving but don’t worry, our incredible analytical support will not be stopped all together and our clients and project will be able to beneficiate from our state of the art infrastructure… There will also be a new toy in the analytical lab… more on this in September 2020.

22
Like this post
  • In preparation for the fall crops
    Previous PostIn preparation for the fall crops
  • Next PostPellets at the BTL
    In preparation for the fall crops

Related Posts

Mehdi Bahrami
Doctoral News

Mehdi Bahrami

Véronique Ducharme
Anciens étudiants/employés News

Véronique Ducharme

Ghazal Azadi
Doctoral News

Ghazal Azadi

Gabriel Cirilo Do Nascimento
Interns News Team

Gabriel Cirilo Do Nascimento

logo-white
Gouvernement
Étudiant(e)s
Industriel
Analyses
Équipements
Notre équipe
Publications
Actualités
Nous joindre
logo-white

Centre de mise à l’échelle – CME
3000 boul. de l’université (P3 pavillon)
Sherbrooke, Québec J1K 0A5

ltb@usherbrooke.ca
819.821.8000 p.65505

Copy